Pipe Process Points - Toshiba RAS-07EKH Service Manual

Split wall type
Table of Contents

Advertisement

Note:
Be sure to remove burrs to avoid unevenness on
the flare face which will cause gas leaks.
Cover the pipe end with a polyethylene bag and
on sheet.
Fig. 3-15
3-2-3. Point of Flaring
(1) The exact length of pipe protruding from the face
of the flare die is determined by the flaring, too.
Fig. 3-16
Note:
Too long a protrusion of pipe from the flaring tool
will result in too long a flare; If this happens, the
flare nut will not tighten and the joint will not seat.
Too small a protrusion will cause gas leaks.
CAUTION:
Too large protrusion of pipe results in impos-
sible tightening of the flare nut.
Too small a protrusion of pipe will cause gas
leaks due to insufficient flare surface.
Table 3-1 shows the use of an imperial die and a
rigid die.
Table 3-1
Type of pipe
D (mm)
1/4"
6.35
3/8"
9.52
A (mm)
Imperial
Rigid
1.3
0.7
1.6
1.0
Fine flaring work shows even brightness on the
flared surface and uniform thickness of pipe.
Unsuccessful flaring work causes gas leaks,
therefore rework it.
The above faulty flaring will cause gas leaks.
3-2-4. Finishing Work
(1) Fix the pipe firmly on the flare die. Match the cen-
ters of both the flare die and the flaring punch,
and tighten flaring punch fully.

3-3. Pipe Process Points

3-3-1. Pipe Bending
(1) Carefully bend by hand.
Note:
Collapsed pipe cause cooling failure.
(2) Bend with pipe bender. (Since the insulation is
wound on, use the bender by sliding the insula-
tion to one side, or cutting it halfway.)
– 11 –
Fig. 3-17
Fig. 3-18