Appendix; Dual Gate Settings - Chamberlain RSL12U Installation Manual

Hide thumbs Also See for RSL12U:
Table of Contents

Advertisement

TROUBLESHOOTING CHART continued...
SYMPTOM
Solenoid lock not working
correctly.
Switched (SW) Accessory
power remaining on.
Accessories connected to
Switch (SW) Accessory
power not working correctly,
turning off, or resetting.
Accessories connected to
Accessory power not
working correctly, turning
off, or resetting.
Solar operator not getting
enough cycles per day
Solar operator, insufficient
standby time

DUAL GATE SETTINGS

NOTE: We recommend that all accessories and board configurations are set on the primary operator.
MAIN CONTROL BOARD
FEATURE
PRIMARY OPERATOR
Timer-to-
Set the TTC dial to desired
Close
setting
Bi-Part Delay
Bi-Part Delay: ON (will
Switch
open last and close first)
Tandem Mode: OFF
Synchronized Close: ON
TROUBLESHOOTING
POSSIBLE CAUSES
a) Solenoid wired incorrectly
a) In limit setup mode
a) Normal behavior
a) Accessory power protector active
b) Defective control board
a) Insufficient panel wattage
b) Excessive accessory power draw
c) Old batteries
d) Solar panels are not getting enough
sunlight
a) Insufficient panel wattage
b) Excessive accessory power draw
c) Battery capacity too low
SECONDARY OPERATOR
OFF
Bi-Part Delay: OFF (will
open first and close last)
Tandem Mode: OFF
Synchronized Close: ON
SOLUTIONS
a) Check that Solenoid is wired to N.O. and COM terminals. Check that
Solenoid has power (do not power solenoid from control board
accessory power terminals). If shorting lock's NC and COM wires
does not activate Solenoid, then replace Solenoid lock or Solenoid
wiring (refer to Wiring Diagrams).
a) Learn the limits
a) Move accessory to accessory power "ON"
a) Disconnect all accessory powered devices and measure accessory
power voltage (should be 11.5 – 17.5 Vdc). If voltage is correct,
connect accessories one at a time, measuring accessory voltage after
every new connection.
b) Replace defective control board
a) Add more solar panels
b) Reduce the accessory power draw by using LiftMaster low power
accessories
c) Replace batteries
d) Relocate the solar panels away from obstructions (trees, buildings,
etc.)
a) Add more solar panels
b) Reduce the accessory power draw by using LiftMaster low power
accessories
c) Use batteries with higher amp hour (AH) rating

APPENDIX

ACCESSORY
Remote Controls Program remote
LiftMaster
Internet Gateway
Garage and Gate
Monitor
36
PRIMARY OPERATOR
SECONDARY OPERATOR
Program remote controls
controls 1 to 50 to the
51 to 100 to the
primary operator.
secondary operator
Program to primary
operator.
Program to primary
operator.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents