Model SWG Mechanical Parts Exploded View ......................23 Model SWG Mechanical Parts List ..........................24 Model SWG Single Phase Control Box Exploded View and Parts List ..............25 Model SWG Three Phase Control Box Exploded View and Parts List ............... 26 Model SWG Gate Arm Assembly Parts List .......................
Verify that the voltage to be used matches the voltage of the operator. The following contact or non-contact obstruction detection devices have been approved for use with Linear slide gate operators as part of a UL325 compliant installation: Contact Edges: Miller Models*: MG0-20, MGR-20, MGS-20, and ME-120...
You must use Belden 8760 Twisted Pair Shielded distances. 24VAC is available for other devices, such as loop detectors Cable (or equivalent) only – Linear part number 2500-1982, per foot). and photo eyes. See page 10 for details of this connection, as well as dip switch se- lection.
SWG OPERATOR INSTALLATION GUIDE POST MOUNTING INSTRUCTIONS FOR MODEL DOOR MUST FACE AWAY FROM DRIVEWAY NOTE: Maximum gate opening angle is approximately 95 degrees, depending on gate width. If larger opening angle is required, non- standard positioning of the opera- tor and modifi...
SWG OPERATOR INSTALLATION GUIDE STRING METHOD FOR NONSTANDARD INSTALLATION OF SWING GATE OPERATORS Step A: Position the Operator 1. Connect the gate plate assembly onto the gate at the recommended location for a standard installation (Dimension “W”). 2. Open the gate to its fully-open position.
SWG OPERATOR INSTALLATION GUIDE ARTICULATING-STYLE ARM ASSEMBLY INSTRUCTIONS FOR MODEL Numbered items in these drawings are for instruc- tional reference only. For actual part numbers, go to the parts lists in the back of this booklet. Place the crank extension (2) on the operator crank Slide a 1/2”...
VENT PLUG INSTALLATION Gear reducers used in Linear gate operators will have solid plugs installed prior to shipment in order to keep the oil inside from spilling out during shipping. A vent plug has been provided to replace this plug during installation. This plug will look similar to the ones shown below.
Keep clear of gate during operation. All Linear gate operators are supplied with a power disconnect switch to turn on and off the power supply available to the operator. Incoming power should be brought into the operator and connected to the labeled pigtails in the disconnect box, following wiring specifi...
SWG OPERATOR INSTALLATION GUIDE CONTROL BOARD ADJUSTMENTS LIMIT SWITCH L.E.D.s LIMIT SWITCH CONNECTOR TERMINAL STRIP #1 CONNECTOR TERMINAL STRIP #2 DIAGNOSTIC CONNECTOR L.E.D.s NOTE: DO NOT FORCE 270-DEGREE POTENTIOMETERS BEYOND THEIR NORMAL RANGE OF MOTION OR DAMAGE MAY RESULT! Auto Close Timer Adjustment: This 270-degree adjustable potentiometer will signal the operator to close automatically, provided no open, reversing or obstruction signals are present from the fully-open position.
(See page 10 for details.) You must follow all required safety precautions and instructions at all times. Review the safety brochure in- cluded with the operator. If any pages are missing or unreadable, contact Linear at 1-800-421-1587 to request additional copies.
A three-wire shielded conductor cable is required to connect master and slave operators. You must use Belden 8760 Twisted Pair Shielded Cable (or equivalent) only – Linear part number 2500-1982, per foot). See page 10 for details of this connec- tion, as well as dip switch selection.
SWG OPERATOR INSTALLATION GUIDE ONBOARD L.E.D. INDICATOR DESCRIPTIONS Control Board L.E.D. Indicators: OPEN This indicator is lit when an open signal is present. This signal can come from such devices as button stations, radio receivers, keypads and telephone entry systems.
SWG OPERATOR INSTALLATION GUIDE IMPORTANT NOTES FOR INSTALLATION OF MASTER/SLAVE APPLICATIONS When setting up Master/Slave gate operators, it is best to make adjustments and run each operator individually. To do this, simply: a. Set Dip Switch #4 to proper hand of operation (right-hand or left-hand) b.
Replace if necessary. HOW TO ORDER REPLACEMENT PARTS Use the part numbers listed on the following pages. Contact your local Linear dealer or distributor to order parts. 1. Supply the model number and serial number of your operator.
SWG OPERATOR INSTALLATION GUIDE MODEL MECHANICAL PARTS LIST REF. REF. PART NO. DESCRIPTION PART NO. DESCRIPTION 2120-361-BT Complete Enclosure Assembly 2500-764 Limit Switch with Door 2100-586 Limit Bracket 2110-067-BT Enclosure Assembly without Door 2510-248 Stop/Reset Button and Bracket 2120-362-BT Enclosure Door and Lock Assembly...
SWG OPERATOR INSTALLATION GUIDE MODEL SINGLE PHASE CONTROL BOX PARTS LIST PART NO. DESCRIPTION PART NO. DESCRIPTION 2100-1778 Control Box Wrapper 2300-696 Clear Control Box Cover 2100-1757 Control Box Mounting Plate 2300-735 Heyco Bushing, 1.09 diameter 2100-1762 Terminal Strip Bracket, Output Side...
SWG OPERATOR INSTALLATION GUIDE MODEL THREE PHASE CONTROL BOX PARTS LIST PART NO. DESCRIPTION PART NO. DESCRIPTION 2500-071 Terminal Strip, 16-141 2100-1865 Control Box Wrapper 2500-270 Terminal Strip, 9-142 OR 2100-1866 Control Box Cover 2100-1864 Terminal Strip Bracket 2500-185 Terminal Strip, 13-142...
SWG OPERATOR INSTALLATION GUIDE NOTE: CRANK SHOWN FOR REFERENCE ONLY MODEL GATE ARM ASSEMBLY PARTS LIST PART NO. DESCRIPTION 2120-449-BT Complete Arm Assembly 2100-1913-BT Crank (not included in arm assembly) 2100-1722-BT Crank Extension 2100-1924-BT Overtravel Stop 2100-1597 Gate Arm Clamp...
Page 28
SWG OPERATOR INSTALLATION GUIDE Imperial Oil MATERIAL SAFETY DATA SHEET HANDLING, STORAGE AND SHIPPING: Keep containers closed. Handle and open Date Prepared: February 02, 1996 containers with care. Store in a cool, well ventilated place away from incompatible mate- Supersedes: January 07, 1995 rials.
• Keep clear of gate during operation. GENERAL: Linear gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance. To ensure that your unit is ready for operation at all times--and to preclude serious damage or failure--inspect the unit systematically.
SWG OPERATOR INSTALLATION GUIDE GATE OPERATOR INSTALLATION CHECKLIST INSTALLER CUSTOMER ________ ________ 1. The gate has been checked to make sure it is level and moves freely in both directions. ________ ________ 2. Potential pinch areas have been guarded so as to be inaccessible OR have contact and/ or non-contact obstruction sensing devices installed.
Need help?
Do you have a question about the SWG and is the answer not in the manual?
Questions and answers