Page 1
BGUS /BGUS-D SG/SG-D INSTALLATION GUIDE BGUS BGUS-D SG-D Operator models contained in this manual conform to UL325 standard for use in Class I, II, III, and IV applications USA & Canada (800) 421-1587 & (800) 392-0123 (760) 438-7000 - Toll Free FAX (800) 468-1340...
Model SG-D Mechanical Parts List ... 25 Model SG/SG-D Arm Exploded View and Parts List ... 26 Models BGUS and SG Control Box Exploded View and Parts List ... 27 Models BGUS-D and SG-D Control Box Exploded View and Parts List ... 28 Battery Maintenance ...
SAFETY INFORMATION AND WARNINGS Read the following before beginning to install LINEAR barrier gates: 1. All electrical connections to the power supply must be made by a licensed electrician and must observe all national and local electrical codes.
You must use Belden 8760 Twisted Pair Shielded Cable (or equivalent) only – LINEAR part number 2500-1982, per foot). See Page 9 for details of this connection, as well as dip switch selection. Note: The SHIELD wire should be connected in both the master and slave operators.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MOUNTING INSTRUCTIONS INSTALLATION ON CONCRETE CURB 1. Uncrate the gate. Avoid damaging the cabinet fi nish. 2. Leave the machine bolted to the bottom pallet until ready to install. 3. Open the cabinet door.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE BARRIER GATE ARM INSTALLATION FOR MODEL 1. Make sure the barrier gate is in the full closed 2. With someone’s assistance, lift the arm (#2) up to a 3. Using the hardware (#3) provided, attach the arm to position height even with the barrier gate fl...
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE BARRIER GATE ARM INSTALLATION FOR MODEL 1. Assemble the SG arm on the ground fi rst, making sure to leave all fasteners loose, including the spreader arms (#4 & #7 above). 2. Make sure the barrier gate is in the full closed position.
ELECTRICAL CONNECTION AND ADJUSTMENTS All LINEAR gate operators are supplied with a power disconnect switch to turn on and off the power supply available to the operator. Incoming power should be brought into the operator and connected to the labeled pigtails in the disconnect box, following wiring specifi...
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CONTROL BOARD ADJUSTMENTS LIMIT SWITCH L.E.D.s LIMIT SWITCH CONNECTOR TERMINAL STRIP #1 CONNECTOR 3A FUSE 2A FUSE TERMINAL STRIP #2 CONNECTOR NOTE: DO NOT FORCE 270-DEGREE POTENTIOMETERS BEYOND THEIR NORMAL RANGE OF MOTION...
24VDC+ & 60 You must follow all required safety precautions and instructions at all times. Review the safety brochure included with the operator. If any pages are missing or unreadable, contact LINEAR at 1-800-333-1717 to request additional copies. Controls intended for user activation must be located at least six feet (6’) away from any moving part of the gate and where the user is prevented from reaching over, under, around or through the gate to operate the controls.
A three-wire shielded conductor cable is required to connect master and slave operators. You must use Belden 8760 Twisted Pair Shielded Cable (or equivalent) only – LINEAR part number 2500-1982, per foot). See Page 9 for details of this connection, as well as dip switch selection.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE ONBOARD L.E.D. INDICATOR DESCRIPTIONS Control Board L.E.D. Indicators: OPEN This indicator is lit when an open signal is present. This signal can come from such devices as button stations, radio receivers, keypads and telephone entry systems.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE CHARGER BOARD SLEEP MODE When primary AC power is not available, the operator will continue to operate in battery only mode if the charger board is set in its RUN mode (see Battery Backup Charger Confi guration). Accessories wired into the operator will continue to draw power, even when the operator is not opening or closing the gate.
A. Check the setscrews in limit cams and limit sprockets for tightness. Replace if necessary. HOW TO ORDER REPLACEMENT PARTS Use the part numbers listed on the following pages. Contact your local LINEAR dealer or distributor to order parts. 1. Supply the model number and serial number of your operator.
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL Ref. * Specify color and texture MECHANICAL PARTS LIST Part Number Description 2110-780* Welded Cabinet Assembly 2110-318* Enclosure Door 2220-008 Lock Assembly with Key 2110-746 Bearing Block Assembly Kit 2110-034 Drive Shaft Assembly...
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE MODEL Ref. SG/SG-D ARM PARTS LIST Part Number Description 2700-082 Arm Assembly, complete with hardware 2700-082-NOHDWE Arm Assembly, less hardware 2110-756 Hardware only 2100-495 Wood Arm, 1” x 6” x 16’ (2 required) 2100-496 Wood Extension Arm, 1”...
MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE The gel-cell batteries in this operator require no routine maintenance. For assured continued performance, they should be replaced every year. If power is to be removed for one week or more, disconnect the negative wire from the batteries as this will prevent deep discharging.
• Keep clear of gate during operation. GENERAL: LINEAR gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance. To ensure that your unit is ready for operation at all times--and to preclude serious damage or failure--inspect the unit systematically.
Imperial Oil MODEL BGUS/BGUS-D • SG/SG-D OPERATOR INSTALLATION GUIDE Date Prepared: February 02, 1996 Supersedes: January 07, 1995 MSDS Number: 225570 Cette fi che signaletique ast aussi disponible en francais 1. PRODUCT INFORMATION Product Identifi er: ESSO GEAR OIL GX 80W-90 Application and Use: Premium quality multigrade extreme pressure gear oil for use in automotive applications including some manual transmissions.
Need help?
Do you have a question about the BGUS and is the answer not in the manual?
Questions and answers