System Should Be Up And Running; Finishing Touches; Hot-Swappable" Pcie Cards (Optional) - Magma EB7R-x8 User Manual

Pcie expansion system expressbox universal (ebu), pci express to pci express expansion
Table of Contents

Advertisement

M A G M A

System Should Be Up and Running

Apply power to the Magma expansion chassis first, then power up the
computer.
Use the procedures detailed in
installation(s) in the Windows Device Manager or Apple System Profiler.
When everything is functioning correctly, your Windows Device
Manager should look something like this for any given slot:
NOTE: The Physical slots do not show up in order as demonstrated
above in Device Manager!
If you discover that any of your 3
(exclamation) you have a problem with that card. Refer to
Troubleshooting

Finishing Touches

After your system is working properly, replace any empty slots with slot
covers, and replace the host computer and the expansion chassis
covers.
Last, if you previously installed the rack slides (PN RSLIDES-XX),
simply insert the chassis rails into the rack rail, slide it into the rack and
snap-lock it into position.

"Hot-Swappable" PCIe Cards (optional)

New technology allows you to remove your 3
maintenance or replacement – without shutting the system down.
24
for further guidance.
Chapter 3
rd
Party PCIe cards contains a
rd
to confirm the card
Chapter 6
Party PCIe cards for

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eb7-x8Ebu

Table of Contents