Through Roof Installation - Drolet Edison Installation And Operation Manual

Table of Contents

Advertisement

Edison Installation and Operation Manual

4.5.3 Through Roof Installation

1.
Position stove following clearances given
Section 3.2: Minimum Clearances
in
to Combustibles and following vent
manufacturer's instructions.
2. Install a cleanout tee to the stove
exhaust. If necessary, use a horizontal
additional length between the exhaust
and the tee. If you wish to center the
vertical part of the vent with the stove,
a 45° elbow and a tee can be used to
route the pipe from the exhaust
towards the back center of the stove.
3. Drop the plumb bob over the center of
the tee outlet and mark location on the
ceiling. Install the ceiling support and
the vent pipe by following the vent
manufacturer's instructions.
4. Always
follow
clearances
combustible materials. When passing
through additional floors or ceilings,
always install a fire stop spacer.
5. After lining up for hole in roof, cut either
a round or square hole in roof. Install
upper edge and sides of flashing under
roofing materials. Nail it to the roof
along upper edge. Do not nail lower
edge. Seal nail heads with flexible
waterproof sealant.
6. Apply high temperature waterproof
silicone sealant where the storm collar
meets the vent.
down until it sits on the flashing.
Seal and install
7.
required, seal and install a storm collar.
vent
manufacturer's
instructions
from
Slide storm collar
vertical roof vent. If
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp00065

Table of Contents