Maintenance; Maintenance And Annual Startup - Lochinvar SOLUTION 260000 Installation & Service Manual

45,000 - 260,000 btu/hr
Table of Contents

Advertisement

7

Maintenance

Maintenance and annual startup

Table 7A_Service and Maintenance Schedules
Service technician
(see the following pages for instructions)
General:
• Address reported problems
• Inspect interior; clean and vacuum if
necessary;
• Check for leaks (water, gas, flue)
• Examine venting system
• Check system water pressure/system
piping/expansion tank
• Check control settings
• Check wiring and connections
• Flame inspection (stable, uniform)
• Check flue gas passageways
• Inspect and clean the burners
• Perform
performance verification per Section 6 -
Start-up.
If combustion or performance
indicate need:
• Clean heat exchanger
• Remove and wash burners
start-up
checkout
and
Installation & Service Manual
Owner maintenance
(see the User's Information Manual for instructions)
• Check appliance area
• Check pressure/temperature
gauge
Daily
• Check vent piping
Monthly
• Check relief valve
• Test low water cutoff (if used)
Periodically
• Reset button (low water cutoff)
• Check appliance piping (gas and
Every
water) for leaks
6 months
• Operate relief valve
• Shut appliance down (unless
End
boiler used for domestic hot
of season
water)
months
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents