Dell Storage Center SCv2000 Deployment Manual page 47

Hide thumbs Also See for Storage Center SCv2000:
Table of Contents

Advertisement

– Include all Storage Center physical WWNs of Storage Center system A and the virtual WWNs of
Storage Center system B on the particular fabric.
– Include all Storage Center physical WWNs of Storage Center system B and the virtual WWNs of
Storage Center system A on the particular fabric.
NOTE: Some ports may not be used or dedicated for replication, however ports that are used
must be in these zones.
Port Zoning Guidelines
When port zoning is configured, only specific switch ports are visible. If a storage device is moved to a
different switch port that is not part of the zone, it is no longer visible to the other ports in the zone.
When you configure port zoning:
Include all Storage Center front-end ports.
For each host server port, create a zone that includes a single server HBA port and all Storage Center
ports.
Create server zones that contain all Storage Center front-end ports and a single server port.
For Fibre Channel replication, include all Storage Center front-end ports from Storage Center system
A and Storage Center system B in a single zone.
Labeling the Front-End Cables
Label the front-end cables to indicate the storage controller and port to which they are connected.
Prerequisites
Locate the front-end cable labels that shipped with the storage system.
About this task
Apply cable labels to both ends of each cable that connects a storage controller to a front-end fabric or
network, or directly to host servers.
Steps
1.
Starting with the top edge of the label, attach the label to the cable near the connector.
Figure 38. Attach Label to Cable
2.
Wrap the label around the cable until it fully encircles the cable. The bottom of each label is clear so
that it does not obscure the text.
Connect the Front End
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storage center scv2020Scv2000Scv2020

Table of Contents