6. Heat pump
See Fig. 29 - - 32 for thermostat connections.
When installed with a heat pump, the furnace control auto-
matically changes the timing sequence to avoid long
blower off times during demand defrost cycles. Whenever
W/W1 is energized along with Y1 or Y/Y2, the furnace
control CPU will transition to or bring on the blower mo-
tor BLWM at cooling airflow or low- -heat airflow,
whichever is lowest. The blower motor BLWM will re-
main on until the main burners ignite then shut OFF and
remain OFF for 25 seconds before coming back on at
heating airflow. When the W/W1 input signal disappears,
the furnace control begins a normal inducer post- -purge
period while changing the blower airflow. If Y/Y2 input is
still energized the furnace control CPU will transition the
blower motor BLWM airflow to cooling airflow. If Y/Y2
input signal disappears and the Y1 input is still energized
the furnace control CPU will transition the blower motor
BLWM to low- -cooling airflow. If both the Y1 and Y/Y2
signals disappear at the same time, the blower motor
BLWM will remain on at low- -heat airflow for the selected
blower- -OFF delay period. At the end of the blower- - OFF
delay, the blower motor BLWM will shut OFF unless G is
still energized, in which case the blower motor BLWM
will operate at continuous blower airflow.
7. Component test
The furnace features a component test system to help dia-
gnose a system problem in the case of a component fail-
ure. To initiate the component test procedure, ensure that
there are no thermostat inputs to the control and all time
delays have expired. Turn on setup switch SW1- -6. (See
Fig. 26.)
NOTE: The component test feature will not operate if the control
is receiving any thermostat signals or until all time delays have
expired.
The component test sequence is as follows:
a. The furnace control CPU turns the inducer motor ON
at high- -heat speed and keeps it ON through step c.
b. After waiting 10 seconds the furnace control CPU
turns the hot surface igniter ON for 15 seconds, then
OFF.
c. The furnace control CPU then turns the blower motor
BLWM on at 50 percent torque for 15 seconds, then
OFF.
d. After shutting the blower motor OFF the furnace con-
trol CPU switches the inducer to low- -heat speed for
10 seconds, then OFF.
NOTE: The EAC terminals are energized when the blower is
operating.
After the component test is completed, 1 or more status codes (11
or 25) will flash. See component test section or Service Label
(Fig. 54) for explanation of status codes.
NOTE: To repeat component test, turn setup switch SW1- -6 to
OFF and then back ON.

Wiring Diagram

Refer to wiring diagram Fig. 55.

Troubleshooting

Refer to the service label. (See Fig. 54—Service Label.)
The Troubleshooting Guide (See Fig. 59.) can be a useful tool in
isolating furnace operation problems. Beginning with the word
"Start," answer each question and follow the appropriate arrow to
the next item.
The Guide will help to identify the problem or failed component.
After replacing any component, verify correct operation
sequence.