Electrical Connections; 115-V Wiring - Carrier 58UHV Installation, Start-Up, And Operating Instructions Manual

Upflow/horizontal variable-speed, 2-stage induced-combustion gas furnaces sizes 060-120, series 100
Table of Contents

Advertisement

BLK
BLK
WHT
WHT
GND
115-VOLT FIELD-
JUNCTION
SUPPLIED
BOX
FUSED
DISCONNECT
Fig. 11—Heating and Cooling Application Wiring Diagram 1-Stage Thermostat and Condensing Unit
Apply joint compound (pipe dope) sparingly and only to the male
threads of each joint. The compound must be resistant to the action
of propane gas.
Install an accessible manual shutoff valve upstream of the furnace
gas controls and within 72 in. of the furnace. A 1/8-in. NPT
plugged tapping is provided on the gas valve for test gage
connection. Installation of an additional 1/8-in. NPT plugged
tapping, accessible for test gage connection, installed immediately
upstream of the gas supply connection to the furnace and down-
stream of the manual shutoff valve, is not required. Place ground
joint union between the gas control manifold and the manual
shutoff valve.
Use the proper length of pipes to avoid stress on the gas
control manifold. A failure to follow this warning can cause
a gas leak resulting in a fire, explosion, personal injury, or
death.
Use a backup wrench at the furnace gas control when
connecting the gas pipe to the furnace to avoid damaging gas
controls or manifold.
VOLTS—
UNIT SIZE
HERTZ—
PHASE
060-12
115—60—1
080-16
115—60—1
100-20
115—60—1
120-20
115—60—1
* Permissible limits of the voltage range at which the unit will operate satisfactorily.
† Time-delay fuse is recommended.
‡ Length shown is as measured along wire path between unit and service panel for maximum 2 percent voltage drop.
NOTE 2
W
C
FIVE
WIRE
THREE-WIRE
HEATING-
ONLY
W2
COM
W/W1
NOTE 1
Y/Y2
R
CONTROL
G
BOX
24-VOLT
NOTES: 1.
TERMINAL
BLOCK
FURNACE
Table 5—Electrical Data
OPERATING
VOLTAGE RANGE
Max*
Min*
127
104
127
104
127
104
127
104
FIELD 24-VOLT WIRING
FIELD 115-, 208/230-, 460-VOLT WIRING
FACTORY 24-VOLT WIRING
FACTORY 115-VOLT WIRING
1-STAGE
THERMOSTAT
Y
R
G
TERMINALS
CONDENSING
UNIT
Connect Y/Y2-terminal as shown for proper operation.
2.
Some thermostats require a "C" terminal connection as shown.
3.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
Never purge a line into a combustion chamber. Never use
matches, candles, flame, or other sources of ignition for the
purpose of checking leakage. Use a soap-and-water solution
to check for leakage. A failure to follow this warning can
cause a fire, explosion, personal injury, or death.
Step 7—Electrical Connections

115-V WIRING

Refer to the unit rating plate or Table 5 for equipment electrical
requirements. The control system requires an earth ground for
proper operation.
Do not connect aluminum wire between disconnect switch
and furnace. Use only copper wire.
Make all electrical connections in accordance with the National
Electrical Code (NEC) ANSI/NFPA 70-1996 and local codes or
ordinances that might apply. For Canadian installations, all elec-
trical connections must be made in accordance with CSA C22.1
Canadian Electrical Code, or authorities having jurisdiction.
MAX
MIN
UNIT
WIRE
AMPS
GAGE
10.1
14
10.6
14
12.6
14
13.9
14
9
FIELD-SUPPLIED
FUSED DISCONNECT
208/230- OR
460-VOLT
THREE
PHASE
208/230-
VOLT
SINGLE
PHASE
GND
MAX FUSE OR
MAX WIRE
HACR-TYPE
LENGTH (FT)‡
CKT BKR AMPS†
36
15
34
15
29
15
26
15
A95236

Advertisement

Table of Contents
loading

This manual is also suitable for:

58uxv

Table of Contents