LG AMNW07GDBL1 Service Manual page 83

Lg multi-inverter type air conditioner svc manual(general)
Hide thumbs Also See for AMNW07GDBL1:
Table of Contents

Advertisement

Part 5. Trouble Shooting
Check Point
1. Check the WCN_P(L),P(N) Connection condition at the Main PCB.(Refer to outdoor wiring diagram)
2. Check the DC Link voltage at not operating(280V↑)
3. Check the DC Link voltage at Comp operating(340V↑)
4. Check DC Link Sensing Signal :2.4~2.8V (Refer the Picture)
■ 36k
IN/I
GND
Black
Red
Vdc
<CT Sensing Check Point>
- 82 -
Copyright ©2014 LG Electronics. Inc. All right reserved.
LGE Internal Use Only
Only for training and service purposes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents