1. Wait until inverter PCB DC voltage is discharged after main power off.
2. Pull out V, V, W COMP connector.
3. Set multi tester to resistance mode.
4. If the value between P and N terminal of IPM is short(0Ω) or open(hundreds MΩ), PCB needs to be replaced.(IPM damaged)
5. Set the multi tester to diode mode.
6. In case measured value is different from the table, PCB needs to be replaced.(PCB damaged).
P
U
V
W
Nu Nv Nw
27
26
25
24
23 22 21
Copyright ©2014 LG Electronics. Inc. All right reserved.
Only for training and service purposes
P
U
27
26
0.4 ~ 0.6 V
V
W
Nu Nv Nw
25
24
23 22 21
0.4 ~ 0.6 V
- 77 -
Part 5. Trouble Shooting
PFC_IPM check
U, V, W R S T
LGE Internal Use Only

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents