Download Print this page

GE AIR C18 Service Manual-Installation page 33

Split system air conditioner

Advertisement

Operating Procedures / Photos
Disassemble Motor and Evaporator
Use screwdriver to screw off the two screws
beside the isolation plate and then screw off
the eight screws to remove the motor.
Use screwdriver to screw off the two screws of
the connection board of evaporator. Screw off
the two screws at the tube-exit plate.
Use screwdriver to screw off the screw at the
support
of
evaporator,
support of evaporator, and then manually pull
the evaporator assy to remove it. (refer to
Figure 8-11)
Disassemble Air Outlet Rear Side
Plate Sub-assy
First remove the velvet sheet and the left and
right side plate cushions at the air outlet; then
use screwdriver to screw off the screw shown
in the figure. (refer to Figure 8-14 and 8-15)
disassemble
the
Screw
Figure 8-11
Figure 8-13
Pump
Liquid Level Switch
Figure 8-14
Figure 8-15
30
Screw
Figure 8-12
Screw
Pump Drainage
Cable Bundle
Screw
Screw
Pipe

Advertisement

loading

This manual is also suitable for:

Ge air c24Ge air c34Ge air c41