1) GUARANTEE CONDITIONS. SELCO s.r.l. INDEX : 1) GUARANTEE CONDITIONS 2) PURPOSE OF THE MANUAL 3) MACHINE TECHNICAL SPECIFICATIONS 4) DESCRIPTION OF MACHINE PARTS 5) DESCRIPTION OF MACHINE OPERATION LAY-OUTS OF CARDS 6) DESCRIPTION OF DIAGNOSTIC INDICATIONS : - EXTERNAL...
FIG. 3 5) DESCRIPTION OF MACHINE OPERATION. NOTE : 5.1) (see fig. 3-4) IMPORTANT !: When accessing parts inside the machine, remember that turning off the switch will not prevent the danger of electric shocks. We the- refore advise you to remove the power plug.
FIG. 31 6) DESCRIPTION OF DIAGNOSTIC INDICATIONS. YELLOW led: 6.1) see fig. n°31 Position Colour Status under Meaning normal then either conditions GREEN LED: then then either...
Page 35
FIG. 32 (see fig. 32) Code Meaning Position Colour Status under Meaning normal conditions then then either...
Page 36
Card 15.14.254 (FIG. 33) 6.2) L2 : if then IMPORTANT!: these indications are present only from version 2 onwards of board 15.14.254 which can be identified by following the instructions in point 10.2. then see fig. n°33 Position Status in normal Meaning L3 : if conditions...
8) WARNINGS, PRECAUTIONS, GENERAL 9) DIAGNOSTICS AND REPAIR INSTRUMENTS INFORMATION ON EXECUTING REPAIRS. AND TOOLS. 9.1) 9.1.1) NOTE : NOTE : IMPORTANT!: When accessing parts inside the machine, remember that turning off the switch will not prevent the danger of electric shocks. We the- 9.1.2) refore advise you to remove the plug and wait for about a minute before attempting any job.
For G 240 and G 240 TLH, with reference to the SELCO normalised loads (see TAB. 03), loads 3, 4, 5, 6 and 8 are required selected, depending on current, accor- 10.2)
Page 41
15.14.234. For the machines in this batch the procedure does not apply: they must be sent to SELCO for repair. The board code is given on the board itself in the area indi- cated in figure 34.
10.3) (see from fig. 36 to 43 ) G 240 : (level 1 and 2) NOTE : secondary power diodes checking procedure. NOTE :...
Page 44
power supplies checking procedure power inverter checking procedure (Important! Red cable to screw + and black cable to screw -). current adjustment circuits checking procedure.
Page 47
power supplies checking procedure power inverter checking procedure Important! Red cable to + screw and black cable to -screw power inverter checking procedure secondary power diodes checking procedure IMPORTANT! When taking this measurement, make sure that MMA operating mode has been selected. The TIG H.F.
Page 48
Check procedure for power inverter. NOTE: does not always accurate visual check level 2 diagnostics IMPORTANT!: breakage of the inverter can cause breakage of the input rectifier bridge and you are therefore advi- sed to follow the diagnostic phases in the sequence given in this manual. (level 1) (level 2) NOTE :...
Page 49
Check procedure of secondary power diodes. (level 1 and 2)
Page 50
Check procedure for power supplies G 240 : (level 1 and 2) Position Status in normal Meaning conditions...
Page 51
G 240 TLH : Position Status in normal Meaning conditions...
Page 52
Check procedure for current control circuits G 240 : (level 1 and 2) Selector in TIG Selector in MMA mode mode Colour Normal status Meaning Position Status in normal Meaning conditions (Caution: in the static load test the load must be adapted to the different currents. Adaptation to currents below 30A is difficult)
Page 53
power supplies checking procedure (level 2)
Page 55
G 240 TLH : (level 1 and 2) Colour Status in normal Meaning conditions Position Status in normal Meaning conditions NOTE power supplies checking procedure...
Page 70
11) PARTS DISMANTLING AND RE-INSTALLATION 11.6) PROCEDURE . (see fig. 44 a 48) G 240 : 11.7) 11.1) IMPORTANT ! : Don't forget to fix the yellow-green cable to the cover before refitting the cover definitively. 11.2) IMPORTANT! When replacing the metal base, ensure that you fit the plastic protection between the rectifier unit radiator and the base itself.
Page 71
11.9) 11.14) 11.10) 11.15) IMPORTANT! To insert the component correctly as indicated in point 14, the component terminals must be correctly identified using a tester set to diode 11.16) testing. NOTE : 11.11) 11.17) 11.12) 11.18) 11.13) 11.19) 11.20)
Page 72
G 240 TLH : 11.21) 11.22) IMPORTANT! When mounting the front nipple, use only LOCTITE 577 joint sealing compound or ordinary TEFLON sealing tape. 11.23)
Page 77
12) OPERATING TESTS AND SETTINGS. G 240 : 12.1) 12.2) IMPORTANT ! : When you have executed a setting (e.g. of minimum current), make sure that the other setting (maximum current) is constantly maintained at the set value. A couple of checks are usually enough to consider setting completed.
Need help?
Do you have a question about the Genesis 240 and is the answer not in the manual?
Questions and answers