Adjustments - Scotsman C1448 Installation And User Manual

Modular cuber prodigy plus d series
Hide thumbs Also See for C1448:
Table of Contents

Advertisement

C1448, C1848 D
Air and Water Cooled User Manual

Adjustments

Bridge Thickness - For Service Tech Only
1. Push and hold Off till the machine stops.
2. Remove evaporator cover.
3. Remove curtain.
4. Use a box wrench and rotate the bridge thickness
adjustment screw in 1/8 turn increments CW to
increase bridge thickness.
5. Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
6. Return curtain to its normal position.
7. Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Note: Water cooled models, the refrigeration system
discharge pressure is factory set at 245 PSIG,
which should yield a freeze cycle discharge water
temperature of about 105-110 degrees F. Adjust if
necessary.
1/8 - 3/16" bridge
Too Big
Just Right for
Small Cube
Ice Bridge Thickness Check
December 2014
Page 13
Just Right for
Medium Cube
Ice Thickness Sensor
Too
Thin

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C1848

Table of Contents