Potterton Promax HE Store 90 Litres Installation & Servicing Instructions Manual page 2

Condensing boilers with integrated hot water storage
Hide thumbs Also See for Promax HE Store 90 Litres:
Table of Contents

Advertisement

Natural Gas
Potterton HE Store
G.C.N
o
41 601 24 (90 litre)
G.C.N
o
41 591 76 (115 litre)
G.C.N
o
41 591 77 (150 litre)
© Baxi Heating UK Ltd 2006 All rights reserved. No part of this
publication may be reproduced or transmitted in any form or by any
means, or stored in any retrieval system of any nature (including in any
database), in each case whether electronic, mechanical, recording or
otherwise, without the prior written permission of the copyright owner,
except for permitted fair dealing under Copyrights, Designs and Patents
Act 1988.
Applications for the copyright owner's permission to reproduce or make
other use of any part of this publication should be made, giving details of
the proposed use, to the following address:
The Company Secretary, Baxi Heating UK Ltd, Pentagon House,
Sir Frank Whittle Road, Derby, DE21 4XA.
Full acknowledgement of author and source must be given.
WARNING: Any person who does any unauthorised act in relation to a
copyright work may be liable to criminal prosecution and civil claims for
damages.
2
Building Regulations and the Benchmark
Commissioning Checklist
Building Regulations (England & Wales) require
notification of the installation of a heating appliance to
the relevant Local Authority Building Control
Department. From 1 April 2005 this can be achieved via
a Competent Persons Self Certification Scheme as an
option to notifying the Local Authority directly. Similar
arrangements will follow for Scotland and will apply in
Northern Ireland from 1 January 2006.
CORGI operate a Self Certification Scheme for gas
heating appliances.
These arrangements represent a change from the
situation whereby compliance with Building Regulations
was accepted as being demonstrated by completion of
the Benchmark Logbook (which was then left on site
with the customer).
With the introduction of Self Certification Schemes, the
Benchmark Logbook is being withdrawn. However, a
similar document in the form of a commissioning
checklist and service interval record is incorporated at
the back of these instructions.
This company is a member of the Benchmark initiative
and fully supports the aims of the programme. Its aim is
to improve the standards of installation and
commissioning of central heating systems in the UK and
to encourage the regular servicing of all central heating
systems to ensure safety and efficiency.
Building Regulations require that installations should
comply with manufacturer's instructions. It is therefore
important that the commissioning checklist is completed
by the installer. The relevant section of Building
Regulations only relates to dwellings. Therefore the
checklist only applies if the appliance is being installed
in a dwelling or some related structure.
The flowchart opposite gives guidance for installers on
the process necessary to ensure compliance with
Building Regulations.
© Baxi Heating UK Ltd 2006

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents