To be used with Suprima 30 - 60 models ONLY Installation Instructions Suprima System Boilers with Mid Position Valve Kit Option Wall Mounted Fan Flued Gas Boilers...
Pack Contents - Page 2 Boiler Mounting Frames Sales Code: 1SUPKITL ...Standard for use without Mid Position Valve Sales Code: 2SUPKITL ...Standard for use with Frame Mid Position Valve Adaptor Locknut Olive 15mm Pipe (NOT Supplied) Isolating Valve Fittings F or F rame No.238037 (Standard) Mounting F rame Isolating Valve...
Page 4
Boiler Mounting Frame and Connections - Page 4 Install the Boiler Mounting Frame: 1. After unpacking the mounting frame decide position of flue and mount the frame on the Flue Tube wall. Use the template provided in the pack Hole Minimum which automatically allows for clearances etc.
Page 5
Boiler Mounting Frame and Connections - Page 5 Sealed System System Pipework Run Return Pump Connecting Head Pipe from Through Chart The Top Heating Hot W ater Circuits Pump Mounting F rame through (without Mid Speed mounting Position Valve) frame (NO T Supplied) Remove...
Page 6
The Sealed System Module - Page 6 This sub-assembly provides a support frame for the expansion vessel, pressure relief valve, pressure gauge, pump and inter-connecting pipes Vessel and fittings. These components are pre- Carrier assembled and includes the cable for the pump Securing feed, the flow, return and gas pipes with fittings Screws...
Page 7
The Sealed System Module - Page 7 Flow and Return Pipes The flow and return pipes can now be placed Boiler into the Mounting Frame in the position Frame 15mm Olive indicated in Fig. 7. The flow pipe must be on the left-hand side.
The Sealed System Module - Page 8 Connect the Gas Pipe to the Boiler 1. Connect the gas pipe to the gas valve adaptor This Cap Fit Manual Bleed Valve using the nut and olive supplied. Tighten the nuts MUST Mains Mains on the gas valve and bulkhead adaptors, turn ON...
The Sealed System Module - Page 9 Commissioning Turn on the gas at the meter and test the installation for soundness. Follow the Boiler Installation Instructions Section 3 “Commissioning” (page 21) to complete the Junction Box Cover installation of the system. Re-fit the boiler casing, side casing and system casing.
Page 12
Wiring Diagrams - Page 12 Suprima Boiler Terminal Connector (7 way) Optional Programmer Connector (3 way) Key Colours: Programmer Pump Mains br = Brown Optional T h i s Ap p l i a n c e m u s t b e Ea r t h e d W iring Programmer...
Page 13
To replace the M.P.V. complete, follow stages above and see Pages 6 & 8 for more details. Pump Isolating Valves Bulkhead POTTERTON Connector The complete system will have to be drained in position down, see Pages 4 & 6 for more details.
Replacement of Parts - Page 14 Expansion Vessel 1. Disconnect the flexible hose from the Vessel. This Cap 2. Lift the Expansion Vessel Out of its Carrier and MUST replace with a new one. be LOOSE System Bleed Valves 1. Unscrew the Automatic Bleed Valve from the Fit Manual Bleed Fit Automatic top of the flow pipe.