Lower Door Panel
Fig. 23
30
© Baxi Heating UK Ltd 2007
Fig. 22a
Internal Polysterene
Packaging Piece
Outercase
Break Off Upper &
Lower Pipe Run
Options
10.0 Installation
10.2
Preparing The Boiler
1. Remove the outer carton and packaging.
2. Lift the outercase upwards and remove.
3. Remove the internal packaging.