Section 3: Setup; Needed For Setup; Unpacking - Grizzly G0705 Owner's Manual

Mill/drill w/stand
Hide thumbs Also See for G0705:
Table of Contents

Advertisement

this machine presents
serious injury hazards
to untrained users. read
through this entire manu-
al to become familiar with
the controls and opera-
tions before starting the
machine!
Wear safety glasses dur-
ing the entire setup pro-
cess!
the model g0705 is a
heavy machine. serious
personal injury may occur
if safe moving meth-
ods are not used. to be
safe, get assistance and
use power equipment to
move the shipping crate
and remove the machine
from the crate.
Model G0705 (Mfg. since 09/09)

section 3: setup

needed for setup

the following are needed to complete the setup
process:
description
precision level ........................................... 1
safety glasses (for each person) ............... 1
solvent/Cleaner .......................................... 1
shop rags .................................................. 1
Brass hammer ........................................... 1
lifting straps (rated for at least 750 lbs.) .. 2
lifting equipment
(rated for at least 750 lbs.) ........................ 1
another person .......................................... 1

unpacking

Your machine was carefully packaged for safe
transportation. Remove the packaging materials
from around your machine and inspect it. If you
discover any damage, please call us immediately
at (570) 546-9663 for advice.
Save the containers and all packing materials for
possible inspection by the carrier or its agent.
Otherwise, filing a freight claim can be difficult.
When you are completely satisfied with the condi-
tion of your shipment, inventory the contents.
SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.
Qty
-15-

Advertisement

Table of Contents
loading

Table of Contents