4.2.13 Operation Scenarios/Transfer Procedures; Figure 9 From Start-Up To Normal Operation, Loads To Be Split Between Two Distribution Feeders; Figure 10 From Combined Loads Operation To Loads Split Between Two Feeders; Figure 11 From Continuous Tied Systems To Loads Split Between Two Systems - Liebert Series 610 User Manual

Continuous power-tie configuration multi-module ups
Hide thumbs Also See for Series 610:
Table of Contents

Advertisement

4.2.13 Operation Scenarios/Transfer Procedures

Refer to the section listed below each figure for the operational procedure to perform the function
indicated.
Figure 9
From start-up to normal operation, loads to be split between two distribution feeders
Initial Conditions Prior to Startup
System 1
M
M
1
1
Tie Open
See 4.1 - Initial System Start-Up.

Figure 10 From combined loads operation to loads split between two feeders

Combined Loads Operation
System 1
M
M
1
1
See 4.2.6 - Returning an Isolated System to Normal
Operation - End Combined Loads Operation.

Figure 11 From continuous tied systems to loads split between two systems

Continuous Tied Systems
System 1
M
M
1
1
Continuous Tie
operation for
module out of
service
See 4.2.11 - Returning Parallel Systems to Normal
Operation - End Continuous Tie.
FROM:
System 2
SS
SS
M
M
1
2
2
Tie
Load 1 Load 2
FROM:
System 2
SS
SS
M
M
1
2
2
Tie Closed
Tie
Load 1 Load 2
FROM:
System 2
SS
SS
M
M
1
2
2
Tie Closed
Tie
Load 1 Load 2
M
2
1
LEGEND: M
M
2
1
LEGEND: M
M
2
1
LEGEND: M
33
Operating Instructions
TO:
Normal Operation
System 1
System 2
M
SS
SS
1
1
2
Tie Open
Tie
Load 1 Load 2
= Module
x
SS
= Static Bypass Switch
x
TO:
Normal Operation
System 1
System 2
M
SS
SS
1
1
2
Tie Open
Tie
Load 1 Load 2
= Module
x
SS
= Static Bypass Switch
x
TO:
Normal Operation
System 1
System 2
M
SS
SS
1
1
2
Tie Open
Tie
Load 1 Load 2
= Module
x
SS
= Static Bypass Switch
x
M
M
2
2
M
M
2
2
M
M
2
2

Advertisement

Table of Contents
loading

Table of Contents