To Install The Receiver; Installation Of Transmitter - Atag CT200001 User Manual

7 day, single channel digital wireless programmer and room thermostat
Table of Contents

Advertisement

1.

To install the receiver

1.
Turn the power off to the boiler
2.
Remove the boiler front panel and swing the control panel into the service position. Refer to
boiler Installation & Servicing Manual.
3.
With a sharp knife, cut out the small plastic cutaway (fig 1) to allow the wires to go through
and the wires grommet to secure into position.
4.
Remove the blank clock control panel and feed the wires through to the back (fig 2). Fit the
new receiver front panel into the facia of the boiler.
5.
Check the wires grommet is in the correct position (fig 3).
6.
Fit the black connector with two black wires onto the volt free connection next to the black
label with a house symbol and on / off below (fig 4).
7.
Remove the small electrical blanking cover and fit the White connector with brown and blue
wires to the 230v ac connection terminals (fig 4).
8.
Secure the wires in to wire clips as shown in fig 5.
9.
Swing the control panel back up into operating position.
10.
Power up the boiler and check for correct operation.

1. Installation of Transmitter

Locate and fit the transmitter to the wall 1.5m from the floor, taking into consideration where
not to position the transmitter as shown the next diagram.
The following can reduce, deflect or block radio frequency signals between the transmitter
and receiver.
a. Steel reinforced walls.
b. Large metallic objects e.g. kitchen appliances, filing cabinets, mirrors etc.
c. Maximum distance between Receiver and Transmitter is:-
i. In open air 50m.
ii. In building 20m to 30m depending on radar obstruction.
Rev: 02/15/004

Advertisement

Table of Contents
loading

Table of Contents