D-Link ShareCenter DNS-340L User Manual page 378

4-bay cloud network storage enclosure
Hide thumbs Also See for ShareCenter DNS-340L:
Table of Contents

Advertisement

Section 4 - Configuration
Remote
Task: The name of the remote backup job.
Backups list:
Schedule: When the remote backup job will execute.
Status: Current status which can be:
• Ready: The remote backup job is ready to be executed.
• Finished: The remote backup job has executed completely
and successfully.
• Failed: The remote backup job was unsuccessful during
execution.
Enable/Disable: If the button shows a red circle the remote
backup job is enabled. Clicking the red button will disable
the remote backup job and the button will change to a green
right-pointing triangle. Clicking the green triangle will enable
the job again.
Backup now: Clicking this button will execute the backup job
immediately as long as the job is enabled.
Recovery: Clicking this button will write the backup files and
folders back into the source file system from the backup target
system (reverse the file direction).
Navigation buttons: Use these buttons to move up and down
in the list when there are multiple jobs configured.
Refresh Button: Click this button during a backup or recovery
process to monitor the progress by updating the progress
completed bar.
D-Link ShareCenter DNS-340L User Manual
376

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents