Agc; Apc; Adc - LG KG290 Service Manual

Hide thumbs Also See for KG290:
Table of Contents

Advertisement

12. AUTO CALIBRATION

12.5 AGC

This procedure is for Rx calibration.
In this procedure, We can get RSSI correction value. Set band EGSM and press Start button the
result window will show correction values per every power level and gain code and the same
measure is performed per every frequency.

12.6 APC

This procedure is for Tx calibration.
In this procedure you can get proper scale factor value and measured power level.

12.7 ADC

This procedure is for battery calibration.
You can get main Battery Config Table and temperature Config Table will be reset.
LGE Internal Use Only
Copyright © 2007 LG Electronics. Inc. All right reserved.
- 130 -
Only for training and service purposes

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kg291

Table of Contents