SAFETY PRECAUTIONS Read
entire installation section before you start installa-
tion.
WARNING
ELECTRIC SHOCK can kill.
• Only qualified personnel should
perform this installation.
• Turn the input power OFF at the
disconnect switch or fuse box before working on
this equipment. Turn off the input power to any
other equipment connected to the welding system
at the disconnect switch or fuse box before work-
ing on the equipment.
• Do not touch electrically hot parts.
• Always connect the POWER WAVE
grounding lug to a proper safety (Earth) ground.
-------------------------------------------------------------
SELECT SUITABLE LOCATION
The POWER WAVE
S350 will operate in harsh envi-
®
ronments. Even so, it is important that simple preven-
tative measures are followed in order to assure long
life and reliable operation.
• The machine must be located where there is free
circulation of clean air such that air movement in
the back, out the sides and bottom will not be
restricted.
• Dirt and dust that can be drawn into the machine
should be kept to a minimum. The use of air filters
on the air intake is not recommended because nor-
mal air flow may be restricted. Failure to observe
these precautions can result in excessive operating
temperatures and nuisance shutdown.
• Keep machine dry. Shelter from rain and snow. Do
not place on wet ground or in puddles.
• Do not mount the POWER WAVE
bustible surfaces. Where there is a combustible
surface directly under stationary or fixed electrical
equipment, that surface shall be covered with a
steel plate at least .060" (1.6mm) thick, which shall
extend not less than 5.90" (150mm) beyond the
equipment on all sides.
INSTALLATION
LIFTING
this
Both handles should be used when lifting POWER WAVE
S350. When using a crane or overhead device a lifting strap
should be connected to both handles. Do not attempt to lift the
POWER WAVE
EQUIPMENT can
cause injury.
-------------------------------------------------------------
S350
®

STACKING

The POWER WAVE

TILTING

Place the machine directly on a secure, level surface or on a
recommended undercarriage. The machine may topple over if
this procedure is not followed.

INPUT AND GROUND CONNECTIONS

Only a qualified electrician should connect the POWER WAVE
S350. Installation should be made in accordance with the
appropriate National Electrical Code, all local codes and the
information in this manual.

MACHINE GROUNDING

The frame of the welder must be grounded. A ground terminal
marked with a ground symbol is located next to the input
power connection block.
See your local and national electrical codes for proper ground-
ing methods.

HIGH FREQUENCY PROTECTION

The EMC classification of the POWER WAVE
S350 over com-
®
Industrial, Scientific and Medical (ISM) group 2, class A. The
POWER WAVE
L10093 for further details).
Locate the POWER WAVE
machinery. The normal operation of the POWER WAVE
may adversely affect the operation of RF controlled equipment,
which may result in bodily injury or damage to the equipment.
POWER WAVE
S350 with accessories attached to it.
®
WARNING
• Lift only with equipment of ade-
quate lifting capacity.
• Be sure machine is stable when
lifting.
• Do not operate machine while
suspended when lifting.
FALLING
S350 cannot be stacked.
®
S350 is for industrial use only. (See print
®
S350 away from radio controlled
®
S350
®
A-3
®
®
S350 is
®
S350
®

Advertisement

Table of Contents
loading

Table of Contents