Columbia CSC SERIES Installation, Operation & Maintenance Manual page 25

Csc series direct vent gas fired hot water boiler
Table of Contents

Advertisement

Figure 9 - Vent Clearances
consideration should be given to locate the vent termination
Vent Cap must be at least
7' (2.13m) above any
public walkway
Vent cap must 4' (1.2m)
from or below any doors,
windows or gravity air inlet
Vent cap must be at least 4' (1.2m)
horizontally from any electric meters,
gas meters, or relief equipment.
Direct combustion air intake (air inlet permanently
fastened to the boiler for combustion air only) has not
distance requirement.
When multiple boilers are used, a clearance of 12" (300 mm) is required between vent caps.
VENTING INSTRUCTIONS
Note: If there is a potential for excessive winds, special
away from the windward side of the building.
.
Mount vent cap at least 3'
(0.9m) from inside corners.
Vent cap must be at least 3' (0.9m)
above and 10' (3m) from any
forced fresh air inlet.
Locate vent cap to allow 12"
(300mm) min. above grade.
25

Advertisement

Table of Contents
loading

Table of Contents