Columbia CSC SERIES Installation, Operation & Maintenance Manual page 23

Csc series direct vent gas fired hot water boiler
Table of Contents

Advertisement

Figure 3 - Front View Of Termination Kit
Figure 4 - Condensate Tee & Drain
(Required only if horizontal vent lengths exceed 10' (3 m))
Figure 5a - Top View Of Termination Kit And Wall
(For Combustible Wall Installation)
VENTING INSTRUCTIONS
4.
Install vent termination assembly through opening and
secure to outside wall.
5.
Install PVC pipe from vent termination assembly to
boilers air inlet.
6.
Assemble and install vent pipe according to vent pipe
manufacturers instructions.
7.
Install vent pipe through termination assembly and
extend it 3" (7.6 cm) beyond termination assembly.
Figures 5a and 5b.
8.
Install termination wind deflector with four (4) screws
provided. Figures 5a and 5b.
9.
Install draw collar around pipe and tighten nut and bolt
until tightly secured. Figures 5a and 5b.
10.
Secure termination tee according to vent pipe
manufacturers instructions.
Figure 5b - Top View Of Termination Kit And Wall
(For Non-Combustible Wall Installation Remove
Thimble wall Plate Assembly)
23

Advertisement

Table of Contents
loading

Table of Contents