Installation Instructions - Sartorius TopMix2.Touch TM02-X Operating Instructions Manual

Paint-mixing terminal/control panel for potentially explosive areas
Hide thumbs Also See for TopMix2.Touch TM02-X:
Table of Contents

Advertisement

Installation Instructions

The following ambient conditions must be avoided when selecting the installation
location of the terminal/control panel (TM02-X) and the ex-link converter (YCO12-Z)
so you can work with extra speed and accuracy:
– Uneven installation location
– Drafts
– Extreme moisture or chemical vapors
– Extreme heat (e.g. avoid placing the terminal/control panel in close proximity to
a heater or exposing it to direct sunlight) Do not set up the device in a control
cabinet or in any other poorly ventilated location.
If several ex-link converters are used, do not stack them.
– Extreme vibrations
Follow all warnings and safety precautions.
– Before startup, make sure that the power cable is properly connected to the
power supply. In particular, the protective conductor must be connected to
the housing of the ex-link converter. Connect all devices to the potential
equalisation using a ground connection cable (not included) via the
equipotential bonding conductor terminals
Make sure that the cable gauge conforms with national specifications.
Installation must be carried out properly by trained personnel and according
to commonly accepted technical standards.
– Only cables and cable lengths approved by Sartorius should be used, which take
account of the limitations of the cable lengths due to the capacity and
inductance values (see appendix on EC Type Examination Certificate) and the
EMC behavior.
– The external devices connected to the ex-link converter should not be able to
supply peak voltages greater than 375 V to the limits of the ex-link converter.
– The system should only be operated for the first time when it is certain that the
area is not potentially explosive.
– If deviations due to transport damage are evident during startup (no display,
no backlighting, etc.), the system should be disconnected from the power
supply and service professionals should be contacted.
Make absolutely sure that the device is unplugged from the power supply
before connecting/disconnecting data transfer or control lines.
The explosion-protected TopMix paint-mixing weighing system should be set
up in accordance with commonly accepted technical standards. The applicable
national electrical codes and safety regulations for your particular country must
be observed.
– Before commissioning the weighing system in potentially explosive areas, a
check must be carried out by or under the supervision of a qualified electrician
to ensure that the system is in good working order.
Installation
on the device.
Operating Instructions TopMix
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents