Installing the TM02-X Terminal/Control Panel
Installing the TM02-X
Terminal/Control Panel
Connecting to the Ports
2.
5.
3.
8.
7.
6.
10
Operating Instructions TopMix
Secure all plugs and wires to the TopMix
using the respective safety screws or
retaining clips so that no plug can come
loose accidentally from the device during
operation.
Only use cables and cable lengths approved by Sartorius,
see Accessories.
1.
Cables not provided by Sartorius are the responsibility of
the operator.
3.
1. Screw the TopMix ex-link cable YCC01-0040M20 (length:
20 m) to the terminal/control panel.
2. Scale connection e.g.: PMA 7501-X
Connect the PMA with the D-SUB 9-pin cable
YCC01-0041M3.
Tighten the safety screws firmly.
3. Connect the equipotential bonding connector.
4.
This explosion-protected system should be set up
according to commonly accepted technical standards.
The applicable national electrical codes and safety
regulations for your particular country must be observed.
Before commissioning the TopMix, a check must be
carried out by or under the supervision of a qualified
electrician to ensure that the system is in good working
order.
Check whether or not the competent authorities (e.g.
industrial supervisory board) need to be informed. It is
also necessary to carry out inspections of the system
during operation.
Inspection intervals should be such that any significant
defects that may occur can be identified in good time.
Inspections should be carried out at least once every three
years. The applicable requirements and guidelines should
also be observed during operation.
gauge of at least 4 mm
bonding conductor connections (PA) on the device. Instal-
lation must be carried out properly by trained personnel
and according to commonly accepted technical standards.
The system should only be operated for the first time
when it is certain that the area is not potentially explosive.
If deviations due to transport damage are evident during
startup (e.g. no display, no backlighting), the system
should be disconnected from the power supply and
service professionals should be contacted.
Establish a low resistance connection
between the TM02-X terminal/control
panel and the ex-link converter YCO12-Z
using a suitable grounding cable with a
2
(included) via the equipotential