Completion - Benchmark MAIN Installation & Service Instructions Manual

System he range
Table of Contents

Advertisement

12.0 Completion

12.1
Completion
Case Front Panel
1. Hinge the facia panel upwards and refit the case front
panel. Tighten the securing screws (Fig. 51).
2. Instruct the user in the operation of the boiler and system,
explaining the operational sequence.
3. Carefully read and complete all sections of the Benchmark
Commissioning Checklist at the rear of this publication that
are relevant to the appliance and installation. These details
will be required in the event of any warranty work. The
publication must be handed to the user for safe keeping and
each subsequent regular service visit recorded.
4. For IE, it is necessary to complete a "Declaration of
Conformity" to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 "Domestic Gas
Installations". This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and Servicing
Instructions, giving advice on the necessity of regular
servicing.
Fig. 51
Facia Panel
36
© Baxi Heating UK Ltd 2007

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MAIN and is the answer not in the manual?

Questions and answers

Table of Contents