Appliance Type
C
C
12
32
Appliance Category
CAT II
Heat Input
Max
Min
kW
24.8
10.6
Heat Output (Non-Condensing)
Max
Min
kW
24
9.8
Heat Output (Condensing)
Max
Min
kW
25.2
10.1
Max Gas Rate
(Natural Gas - G20)
(After 10 Mins)
m
3
/h
2.62
Burner Pressure
(Natural Gas - G20)
Max Rate
mbar
10.2 ± 0.5
Inlet Pressure (Natural Gas - G20)
mbar
20
Burner Injector (Natural Gas - G20)
15 x 1.18mm Diameter
Electrical Supply
230V~ 50H z
(Appliance must be connected to an
earthed supply)
Power Consumption
170W
External Fuse Rating
3A
Internal Fuse Rating
Fuse 2A Fast Blow to BS 4265
Electrical Protection
IPX5D
SEDBUK Declaration For System 24 HE
The seasonal efficiency (SEDBUK) is 87.4% (87.2% LPG)
Band B
This value is used in the UK Government's Standard Assessment Procedure
(SAP) for energy rating of dwellings. The test data from which it has been
calculated have been certified by 0051.
LPG Propane - G31
Burner Injector 0.77mm diameter
Burner Pressure
Max Rate
Propane
mbar
21.8 ± 0.5
Inlet Pressure
mbar
© Baxi Heating UK Ltd 2007
C
NO x Class
52
2H 3P
Condensate Drain
Flue Terminal
Dimensions
Connections
Gas Supply
Central Heating Flow
Central Heating Return
Pressure Relief Discharge
Outercase Dimensions
Casing Height
Overall Height Inc Flue
Elbow
Casing Width
Casing Depth
Clearances
Above Casing
Min Rate
Below Casing
2 ± 0.5
Front
Front
L.H. Side
R.H. Side
*NOTE: The boiler can be operated with a
clearance of 5mm at the right. This is also
sufficient for routine maintenance. However a
clearance of 20mm is required if it is necessary to
remove the secondary heat exchanger. This
should be considered when siting the appliance
and in the event of any subsequent alterations in
the area of installation
Weights
Packaged Boiler Carton
Installation Lift Weight
Min Rate
4.4 ± 0.2
37
4.0 Technical Data
4.2
3
1" BSP
Diameter
100mm
Projection
125mm
copper tails
-
22mm
-
22mm
-
22mm
-
15mm
-
780mm
-
965mm
-
450mm
-
345mm
200 mm Min
200 mm Min
450 mm Min (For Servicing)
5 mm Min (In Operation)
5mm Min
5mm Min (In Operation)
20mm Min (See Note*)
kg
51
40.5
Pump - Available Head
6
5.5
5
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
0
200
400
l/h
System 24 HE
Central Heating Primary Circuit
Pressures
Safety Discharge
Max Operating
Min Operating
Recommend Operating
Pump
Available Head
See graph below
Expansion Vessel
- (For Central Heating
only. Integral with appliance)
Min Pre-charge Pressure
Max Capacity of
CH System
Primary Water Content
of Boiler (unpressurised)
Temperatures
Flow Temp
(adjustable)
35°C to 85°C
600
800
1000
bar
3
2.5
0.5
1-2
bar
0.5
litre
125
1.2
(± 5°C)
max
1200
11
Need help?
Do you have a question about the MAIN and is the answer not in the manual?
Questions and answers