Carrier 59SC2C Series Installation, Start-Up, Operating And Service And Maintenance Instructions page 21

Single stage 4-way multipoise condensing gas furnace series 1
Table of Contents

Advertisement

INSTALL CLAMPS ON DRAIN TUBE
ATTACH DRAIN TUBE TO CONDENSATE
DRAIN TRAP
PULL DRAIN STUB
THROUGH CASING
OPEN SPRING CLAMP
INSERT FACTORY SUPPLIED 1/2 IN. CPVC
TO 3/4 IN. PVC ADAPTER OR 1/2 IN. CPVC PIPE
*CLAMP MAY BE LOCATED ON OUTSIDE OF DRAIN
TUBE
Fig. 15 - - Formed Rubber Drain Grommet
Fig. 16 - - Modify Rubber Drain Elbow
NOTE: Trap grommet is required only for direct-vent
applications.
Fig. 17 - - Horizontal Drain Trap Grommet
A11342A
A11581
Remove knockout.
Install grommet before
relocating condensate
trap.
A11582
Attach elbow to condensate trap
Cut formed end off
condensate drain
Formed end of
elbow
grommet
Connect short end
of "Z" pipe to modified
drain elbow
Factory supplied 1/2 in. CPVC to
3/4 in. PVC adapter
TRAP, DRAIN ELBOW WITH DISCHARGE PIPE
Formed end of grommet
Open spring clamp. Insert
Modified drain elbow connect to
1/2 in. to 3/4 in. CPVC to
condensate trap and "Z" pipe
PVC adapter or 1/2 in.
CPVC pipe
LEFT SIDE DRAIN ROUTED BEHIND INDUCER
NOTE: Remove Inducer Housing for easier access, if desired.
Fig. 18 - - Drain Trap Connection and Routing
(Appearance may vary)
21
s
L12F015

Advertisement

Table of Contents
loading

Table of Contents