Download Print this page

Preparing The Rails For Integrated Shipping - HP UPS R5500 ERM Installation Instructions Manual

Advertisement

Insert screws through the rack into the mounting rail and
2.
the front of each mounting bracket.
Install cage nuts or clip nuts into the rear of the rack.
3.
Insert screws through the mounting rail into the cage nuts
4.
or clip nuts.
Tighten the hex nuts.
5.
Preparing the rails for
integrated shipping
If the unit is to be shipped in an HP 9000 or
10000 series rack:
Remove the hex nuts, flat washers, and lock washers
1.
from the mounting rail.
Install the rail reinforcement plates and tighten using the
2.
hex nuts with captive washers included in the kit, instead
of the nuts included with the rail.
Install the rear mounting brackets using hex nuts. Wait
3.
until the unit is installed and the brackets are adjusted
before tightening the nuts.

Advertisement

loading