Preparing The Site - HP R1500 - UPS XR User Manual

Ups r12000 xr models installation instructions
Table of Contents

Advertisement

Position
WARNING: To reduce the risk of personal injury or damage
to the equipment, take the following precautions when
installing the equipment:
The UPS must be installed at the bottom of the rack. If
placed in the rack with existing equipment, the rack
must be reconfigured to allow installation of the UPS at
the bottom of the rack.
The UPS must be mounted on the rails included in the
UPS kit. Use the rack template tool included in the UPS
kit to align the rails.
Preparing for Installation

Preparing the Site

Due to the weight of this device, do not proceed until a facilities
engineer evaluates and approves the floor-loading requirements
before installation.
Checking the Battery Recharge Date
Before unpacking the UPS, check the battery recharge date
specified on the battery recharge date label that is affixed to the
shipping carton.
IMPORTANT: Do not use the batteries if the recharge date has passed. If
the date on the battery recharge date label has passed without the batteries
being recharged, contact an HP authorized service representative for
directions.
NOTE: The following label is only an example date. The date on your carton
may be different.
THIS PRODUCT CONTAINS
A NONSPILLABLE BATTERY
Next Recharge Date:
05-MAR-07
Please refer to Maintenance Section
of Owner's Manual enclosed inside
Kit Contents
Documentation
• International Regulatory Compliance guide
• Important Safety Information guide
• Power Products Documentation CD
• Rack and Power Management Pack CD
• This document
Rails
• Rails, with mounting hardware
• Rack template tool 10U (221280-021)
UPS
• UPS chassis
• Four electronics modules
• Four battery modules
• Five front bezel pieces
• Hardware
— M6 x 12 hex bolt (2)
— M6-1 x 12.0 cross recessed screw (20)
— M6 hex nut with conical washer (3)
Cable
One 3.7-m (12-ft) communication cable (201092-002)
Power Distribution Unit (PDU) Option Kit
• 40 A 200–240 V WW Model PDU
• PDU installation instructions
Tools and Materials Required
The following tools are needed:
• Medium flat-bladed screwdriver
• #1 Phillips screwdriver bit
• #3 Phillips screwdriver bit
• Metric tools
— 7-mm
— 8-mm
— 10-mm
• Sheetmetal hole punch tools, up to 44.45 mm (1.75 inches)
in diameter
The following items are supplied with the HP rack:
• Screws
• Cage nuts
• Cage nut-fitting tool

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 phase series

Table of Contents