GMC 1990 Light Truck Repair Manual page 121

Unit repair manual
Table of Contents

Advertisement

Figure 17— Remarking the Housing
Figure 18—Aligning the Adjuster Hole with the
Second Mark
N. Block Tooth
O. Over-Center
Preload Adjuster
Figure 19— Pitman Shaft "Over-Center" Sector
Adjustment
• Measure back (to the left) 13 mm (1/2-inch)
and re-mark the housing (figure 17).
• Rotate the adjuster to the left until the hole in
the adjuster is in line with the second mark
(figure 18).
I
A. Torque Wrench
B. 12 Point Socket
227. Nut
222. Adjusting Screw
251. Stub Shaft
Figure 21— Aligning the Over-Center Preload
O
F1872
POWER STEERING 3B3-7
Seals
A
2
5
B —
• Install the adjuster nut (245) and torque the nut
to 108 N m (80 ft. lbs.). Hold the adjuster plug
to maintain alignm ent of the hole with the
mark.
• Check the turning torque of the stub shaft,
using J 7754-01 and a 12-point socket. The
reading should be taken with the beam of the
I
_
V
007
2 2 2
1
1 X
r
J
L t
'
1
F4929

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents