The Boot Process - Contemporary Controls CTRLink EIAR-10T User Manual

Internet access router
Table of Contents

Advertisement

3.7

The boot process

During the boot process, all services and programs required are started
automatically.
This process will take approx. 2 minutes.
Starting the boot process:
States of the LEDs:
ACTIVE MODEM:
ACTIVE ETHERNET:
ERROR:
POWER:
The settings are loaded.
States of the LEDs:
ACTIVE MODEM:
ACTIVE ETHERNET:
ERROR:
POWER:
A check is carried out to see whether the ETHERNET connection can
be addressed.
States of the LEDs:
ACTIVE MODEM:
ACTIVE ETHERNET:
ERROR:
POWER:
All relevant services, such as firewall and routing, are initialised. The
configuration of the ETHERNET connection is finished.
States of the LEDs:
ACTIVE MODEM:
ACTIVE ETHERNET:
ERROR:
POWER:
The boot phase is now completed; the router is ready for operation.
States of the LEDs:
ACTIVE MODEM:
ACTIVE ETHERNET:
ERROR:
POWER:
off
off
off
green
off
off
red
green
off
red
red
green
off
green
red
green
off
green
green
green
Description of Functions
3-15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CTRLink EIAR-10T and is the answer not in the manual?

Table of Contents