Installation
15/20
15/20
4.3
Installing the communication equipment
32
The following sequence must be observed during assembly:
1. Strip the voltage-free line.
with end splice 15 mm
without end splice 20 mm
2. Introduce a screwdriver vertically into the locking device.
3. Introduce the stripped cable into the cable clamp and pull the screwdriver
out again.
The following sequence must be observed during assembly:
1. Strip the voltage-free line.
2. The IP 55/Outdoor variant has screw terminals. These are fully suited for cop-
per cables from 16 mm
be tightened with a torque of 6-8 Nm. The use of aluminium cables is only
possible for cross sections of 35 mm
tions of the cable/cable socket manufacturer (removal of oxide layer, use of
Vaseline or grease).
CAUTION
Please avoid squeezing the cable insulation or the end splice. Improper connec-
tion may damage the equipment!
The communication interfaces are located above the AC terminals.
to 70 mm
. The screws to the terminal blocks must
- 70 mm
. Please observe the specifica-
PT 30k to PT 33k