Bunn Dual Service Manual page 34

Table of Contents

Advertisement

SERVICE (cont.)
#10-32 slotted head screws holding the solenoid
valve to the mounting bracket.
7. Securely install the new solenoid valve to its
mounting bracket.
8. DUAL BREWERS: Attach the solenoid valve and
mounting bracket to the brewer trunk.
9. Securely fasten the water lines to and from the
solenoid valve.
10. Refer to Fig. 37 when reconnecting the wires.
WHI to Level Control Board T3 (120V, 120/208V or
120/240V Eletro/mechanical)
WHI to Terminal Block (120/208V or 120/240V
Electronic)
RED to Level Control Board T3 (200 or 240V Electro/
mechanical or Control Assy T4 Electronic)
VIO to Level Control Board T1 (Electro/
mechanical)
WHI/BLU to Control Assy #1 (Electronic)
FIG. 37 SOLENOID VALVE TERMINALS
P799
Page 34
41976 031709

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SingleSingle shDual

Table of Contents