12.2 connecting the pumps
The pumps of the heating system (P1 and P2) have to be connected to boiler terminal block following the wiring
of figure 9, a relay must be wired between the boiler control circuit board and the pumps.
Cover
Terminal board
Terminal board
Cover
Terminal board
Figure 9
IstructIons pertaInInG to the Installer
912.199.3 - GB
92