KitchenAid KUDD03DT Installation Instructions Manual page 13

Kitchenaid drawer dishwasher installation instructions
Hide thumbs Also See for KUDD03DT:
Table of Contents

Advertisement

Available languages

Available languages

Option 2: Install custom front panels
Custom front panel dimensions
medallion
cutout area
Top panel
(front view)
23-7/16" (59.5 cm)
medallion
cutout area
Bottom panel
(front view)
23-7/16" (59.5 cm)
1-9/32"
(32.6 mm)
1-7/32"
(30.8 mm)
2-13/32"
(60.8 mm)
Medallion cutout
Upper and lower panel minimum thickness is 5/8" (16 mm). Panel
thickness above 11/16" (18 mm) can be accommodated but
product depth will increase accordingly.
Custom front panel material must be suitable for damp
conditions or adequately sealed to withstand moisture. Using a
moisture-resistant material can provide additional protection.
Taping edges alone may not provide adequate sealing. For
painted panel, paint all rear edges to improve sealing.
2-5/16"
(5.9 cm)
9"
(22.9 cm)
15-5/8"
(39.7 cm)
5"
(12.7 cm)
2-1/8"
9"
(5.4 cm)
(22.9 cm)
(35.6 cm)
5"
(12.7 cm)
end may be round or
squared off
max.
1/4"
(6.4 mm)
NOTE: Do not cut
beyond outline of
medallion cutout.
Rout a 1/4" (6.4 mm)
radius around back side
of medallion cutout.
1-13/64"
(30.6 mm)
(front of panel)
1. Prepare the custom front panels to specifications shown.
2. Mount the handle to the custom panel. The screws must
not extend beyond the back surface of the panel. (Handle
is customer supplied, location is customer preference.)
3. Lay the custom front panel face down on a protective
covering.
4. Measure and mark the vertical centerline and horizontal
position line on the back of the front panels.
5. Feed the wires of the medallion connector through the
front of the custom front panel and push the medallion
into the prepared medallion hole.
14"
6. Remove the pins on both sides of the dishwasher drawer
by pulling the pins straight out with a pair of needle-
nose pliers.
7. Gently pull the bottom of the metal plate away from the
dishwasher, and then pull down.
8. Lay the custom front panel face down.
9. Feed the medallion wires through the wire opening in
the metal plate.
wire opening
horizontal line
Top Panel -
1-7/16" (36.5 mm)
Bottom panel -
mark
1-3/16" (30.2 mm)
centerline
pin
metal plate
mark
front panel
13

Advertisement

Table of Contents
loading

Table of Contents