Miele KFN 9855 iDE Operating And Installation Instructions page 92

Fridge/freezer combination with ice cube maker nofrost system and dynacool
Hide thumbs Also See for KFN 9855 iDE:
Table of Contents

Advertisement

Plumbing
^ Gently push the appliance into the
niche until the back of the appliance
slides into the anti-tipping bracket
(see "Installing the appliance".)
^ Remove the cover from the valve
connector a.
^ The water line is visible at the front of
the appliance. Connect the water line
to the OD adapter.
^ Bleed the air from the water line by
opening the water supply
temporarily.
92
^ Screw the OD adapter onto the
solenoid valve.
^ Open the shut-off valve for the water
supply and check the entire water
system for leaks.
^ The appliance can now be
connected to the electrical supply
(see "Electrical connection").
The water inlet pipe must be primed
(purged of air) by a qualified
technician before using the
appliance for the first time.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents