Completing The Install; Install The Cable Clamp; Mounting The Boiler Switch - Light Wave JSJSLW920 Instruction Manual

Boiler switch
Table of Contents

Advertisement

Installation

Completing the Install

Install the cable clamp

Once the cable(s) have been connected,
the cable clamp needs to be reattached in
order to secure them and to ensure that
they cannot become dislodged from the
terminal connections. The cable(s) should
run thorough holes situated at the base of
Holes
Clamp
the unit.
Hook

Mounting the Boiler Switch

You can now close the boiler casing by
following the relevant instructions from
your manual. It is recommended to
mount the Boiler Switch to the wall next
to the boiler in a suitable place. The
backplate includes two screw holes
which allow the plate to be mounted to a
wall
using
suitable
screws.
Once
mounted, the main unit can be slotted
Mounting
Screws
hole
back
into
place
and
the
screws
tightened.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents