Step 3: Prepare The Mounting Bay - HP StorageWorks Ultrium 232i Getting Started Manual

Ultrium tape drive
Table of Contents

Advertisement

Step 3: Prepare the mounting bay

Warning To avoid personal injury or damage to the server or tape drive, ensure that the server is
disconnected from the mains power supply while you install the drive.
Caution Static electricity can damage electronic components. Always wear an antistatic wriststrap if
one is available. If not, after you have disconnected power from the server and removed the
cover, touch a bare metal part of the chassis. Similarly, touch a bare metal part of the drive
before installing it.
1
Assemble the necessary tools and materials:
• Phillips screwdriver
• Flat-bladed screwdriver (if your server uses slotted screws)
• Torx screwdriver (if your server uses torx screws)
• Your server manuals (for reference during installation)
2
Perform a normal system shutdown and turn off the server and any connected peripherals.
3
Remove the cover and front panel from the server, as detailed in your server's documentation.
As you work inside the server, you may have to disconnect the SCSI cable or power cable
from other devices to maneuver the new drive into place. If you have to do this, make a note
of their position and connections so you can put them back correctly later.
4
Remove the front filler panel from a half-height, 5¼-inch bay of your server, as illustrated. With
some servers, such as the HP AlphaServer ES40, you must also remove the half-height device
divider.
The server must provide forced cooling and be capable of drawing 6 cfm (0.17 m
or 10.08 m
4 cfm at 35
Ensure that empty bays have the appropriate blanking plates installed so that airflow is
maintained.
3
/hour) of air through the tape drive at 40
o
C ambient operation.
o
C ambient operation. This reduces to
3
/minute
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks ultrium 448Ultrium 448i

Table of Contents