7.

INSTALLATION

The air curtain is designed to be located horizontally over a doorway. It must not be installed outside of
the building.
7.1
Location
Mount the air curtain above and as close to the doorway as
possible, with:
the discharge grille not more than 4m above floor level
at least 100mm clearance (air gap) above electric/water
heated air curtains, see Fig 1
Beware of doorway top edges, structural beams, door
opening/closure devices, etc., which may interfere with the air
stream and affect the location of the unit.
NOTE: For the air curtain to work well the width of the open doorway should be less than the length
'A' of the air curtain, see Appendix 1.
7.2
Wall Fixing
:
NOTE
Use suitable wall fixing bolts (not supplied) to fix the unit to the wall, taking into account the
type of wall and the weight of the unit (see section 3: Specifications).
Step 1
Bolt all wall brackets to the rear face of the unit
as shown in Fig 2, using the M6 fixing bolts
supplied.
Step 2
Drill fixing points in the wall, referring to
Appendix 1 for correct positioning.
Step 3
Screw in the top wall bolts leaving a small gap
between the screw head and the wall.
Step 4
Lower the unit onto the bolts via the key-hole
slots in the top of the wall brackets and screw in
the bottom wall bolts.
Step 5
Tighten all fixing bolts until the air curtain is
safely secured to the wall.