Mitsubishi Electric PURY-WP200 Service Manual page 244

Table of Contents

Advertisement

[ IX Troubleshooting ]
(2) Check valve (CV4a, CV6a, CV8a, CV9a, CV10a) replacement procedures
Remove the solenoid valve block ASSY following "(1) Solenoid valve block ASSY (SV4a, SV4b, SV4d) replacement
procedures" on the front page.
Debraze I-O parts (total 7 places), and remove the Check valve ASSY.
Replace the Check valve (CV4a, CV6a, CV8a, CV9a, CV10a) to be serviced while it is removed from the unit.
Braze the pipes as they were according to the angle of the pipes on the figure below (Figure as viewed from point Q).
Mount the solenoid valve block ASSY, coil cover, and peripheral cables back in place according to "(1) Solenoid valve
block ASSY (SV4a, SV4b, SV4d) replacement procedures" on the front page.
I
(ø19.05 [3/4"])
J
(ø15.88 [5/8"])
K
(ø15.88 [5/8"])
Heat exchanger
L
(ø6.35 [1/4"])
M
(ø12.7 [1/2"])
*Precautions for replacing Check valve
Be sure to perform no-oxidation brazing when brazing.
Place a wet towel on the check valve when heating pipes to keep the temperature of the valve from exceeding
120°C [248°F].
After brazing, check the condition around the brazing. After confirming no leakage, evacuate the air inside.
Perform carefully with the flame direction so that it does not burn cables and plates etc. in the unit.
Remove the brazing part protecting heat exchanger fins not to be burn, and replace the service parts.
*1. Refer to Chapter I [8] Vacuum Drying (Evacuation) for detailed procedure.(page 10)
HWE1113B
* After removing Solenoid valve block ASSY
- 235 -
Part A
(Refer to the next page.)
*1
GB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wp250yjm-aCmb-wp108v-g

Table of Contents