Mitsubishi Electric PURY-WP200 Service Manual page 20

Table of Contents

Advertisement

[ I Read Before Servicing ]
7. Notes
To evacuate air from the entire system
Applying a vacuum through the check joints at the refrigerant service valve on the high and low pressure sides (BV1
and 2) is not enough to attain the desired vacuum pressure.
Be sure to apply a vacuum through the check joints at the refrigerant service valve on the high and low pressure
sides (BV1 and 2) and also through the check joints on the high and low pressure sides (CJ1 and 2).
To evacuate air only from the outdoor units
Apply a vacuum through the check joints on the high and low pressure sides (CJ1, and 2).
Open the valves in the HBC controller, and switch on the power to the outdoor units, HBC controllers, and indoor
units before performing evacuation so that all refrigerant circuits will be open. (By switching on the power to the in-
door units, normal M-NET communication will be maintained.)
HWE1113B
- 11 -
GB

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wp250yjm-aCmb-wp108v-g

Table of Contents