Table of Contents

Advertisement

Unit wiring diagram
This model operates at 115 volts except for the cutter
grid circuit which operates at 8.5 volts at 1 amp.
The compressor
runs at all times except when the bin
thermostat
becomes satisfied and opens up. This de-
energizes the system except for the transformer
and
cutter grid.
Under
normal
operating
conditions,
when
the
evaporator
reaches the preset temperature
(+ 100 to
-30 F, depending
on thickness
of ice) the evaporator
thermostat
opens, terminating
operation
of the fan
motor and pump motor. The hot gas solenoid and the
water valve solenoid are energized at this time and re-
main so until the evaporator
reaches 38 + 2OF.
DANGER:
ELECTRIC SHOCK HAZARD disconnect
power
before servicing
unit. Maximum
fuse size: 15
amps.
CUBELET
CUTTER GRIDS
CUBE CUTTER GRID
Check
1'h"x
1%" CUBE GRID
operation
Start the unit by turning the service switch to
"ON"
and opening the line water valve.
NOTE: Left is "OFF" - Middle is "ON" - Right
is "CLEAN."
In "CLEAN"
position,
only the
pump operates.
Check
condenser
fan to make
sure
it is
revolving.
Water will not enter pump pan until freezing
plate gets cold and machine goes into a harvest
cycle.
Check for even water flow over freezing plate.
Unit must be level for proper operation.
Check for desired cube thickness and after 24
hours adjust if necessary. Maximum ice yield will
be obtained with ice thickness
at
l/2"
to 5/e".
Replace grill.
7

Advertisement

Table of Contents
loading

Table of Contents