Installation - Vissani QR027 Use And Care Manual

Stainless steel range hood
Table of Contents

Advertisement

Installation

DRILLING THE PILOT HOLES
- Draw a vertical line (1) on the supporting wall up to the
ceiling, or as high as practical at the center of the area in
which the hood will be installed .
- Draw a horizontal line (2) at 18 in . (458 mm) above an
electric stove or 29 .5 in . (750 mm) above a gas stove .
- Place the chimney support bracket (E) on the wall about
0 .8 in . (20 mm) from the ceiling or upper limit, aligning the
center notch with the vertical reference line (1) . Mark the
wall at the center of the holes in the bracket (E) .
- Place the hood brackets (D) on the wall, aligning their
center notches 11 .2 in . (284 mm) above the horizontal line
(2) and 5 .36 in . (136 mm) apart . Mark the wall at the center
of the holes in the bracket .
- Drill pilot holes at the marked locations .
INSTALLING THE TOGGLE BOLTS AND
CHIMNEY SUPPORT BRACKET
- Screw the four toggle bolts (DD) into the wall, leaving the
head of the bolts approximately 0.25 in. (6.4 mm) away
from the wall surface .
- Place the chimney support bracket (E) over the upper
toggle bolts (DD) . Tighten securely .
0.25 in
(6.4 mm)
DD
Wall
E
D
2
ATTACHING THE HOOD BRACKETS
- Attach the two hood brackets (D) to the back of the range
hood (A) with the four screws (AA) and washers (BB) .
A
11
Please contact 1-800-514-6729 for further assistance .
Ceiling
0.8 in. (20 mm)
5.36 in. (136 mm)
11.2 in.
(284 mm)
1
18–29.5 in.
(458–750 mm)
D
BB
HOMEDEPOT .COM
AA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents