Post Installation Checkout; Heckout And Setup; Gps N Avigation C Heckout - II Morrow Inc. Apollo SL50 GPS Installation Manual

Table of Contents

Advertisement

Installation
P
I
OST
NSTALLATION
Once the unit is installed, complete the checkout procedure to verify proper operation. Refer
to the User's Guide for operating instructions.
The steps that are not applicable to a particular installation may be skipped. A checkout log
sheet is included on page 27 to fill out during the checkout procedure. Make a photocopy of
the log sheet for ease of use if desired.
The checkout procedure is broken into several groups. The GPS Navigation Checkout, VHF
Comm Checkout (SL60), and the Final System Check should be completed with the aircraft
moved clear of hangers and other structures.
Mounting / Wiring Check
Verify that all cables are properly secured and shields are connected to the rear of the
mounting frame. Check the movement of the aircraft controls to verify that there is no
interference.
T
M
C
EST
ODE
HECKOUT AND
The SL50/60 has a built-in test mode to simplify the checkout. To operate the SL50 in the test
mode, hold down the
down the
and
COM
back on.
Avionics Outputs
Check the avionics output connections by using the test mode as follows. Rotate the
knob to select each test.
1. Using the "CDI T
2. Using the "T
O
outputs.
3. Using the "L
AMP
annunciators.
4. Using the "V
ALID
valid flag outputs.
Installation Configuration
The SL50/60 must be configured to match the operation supported by the installation. This
includes IFR and VFR operation selections.
1. In test mode, rotate the
2. Press
, rotate the
SEL
then press
ENT
Note: Make sure that all installation requirements are complete for the selected operation.
Refer to the System Configurations section on page 4 for installation requirements.
Serial Interface Configuration
The SL50/60 RS-232 serial port can be configured for several different input and output
formats. To select the serial port configurations:
1. In test mode, rotate the
22
C
HECKOUT
S
ETUP
and
buttons while switching on the power. For the SL60, hold
WPT
MSG
buttons. To return to normal operation, switch the power off, then
MSG
" page, rotate the
RIANGLE
/F
F
" page, rotate the
ROM
LAG
O
" page, rotate the
UTPUTS
F
P
" page, rotate the
LAG
AGES
knob to the "O
LARGE
knob to select VFR (IFR? N
SMALL
when complete.
knob to the serial port configuration "S
LARGE
knob to check left, mid, and right.
SMALL
knob to check the Off, To, and From
SMALL
knob to check all the connected
SMALL
knob to check all the connected
SMALL
:" page.
PTIONS
) or IFR (IFR? Y
O
Apollo SL50 / SL60 Installation Manual
LARGE
) operation,
ES
P
" page.
ERIAL
ORT

Advertisement

Table of Contents
loading

Table of Contents