Preparing Work For Installation (Artcool Type Only) - LG FLEX MULTI SPLIT Installation Instructions Manual

Flex multi split dual zone & tri-zone
Hide thumbs Also See for FLEX MULTI SPLIT:
Table of Contents

Advertisement

Installation of Indoor, Outdoor Unit

Preparing work for Installation (Artcool Type Only)

Open panel front
1. First, push the front panel backward and lift it up to remove the two screws.
2. The moment of lifting the both lower parts of panel front, you can hear sound this panel came
out, In this time panel front is separated
3. After pull down this panel a bit, and separate connecting wire with product.
Remove cover pipe and cover side
1. Remove two screws(for fixing cover pipe)
2. Pull up the cover side of desired connecting
direction, then cover side is separated.
3. In case of connecting direction is left or right,
path through the hole of cover side.
CAUTION: After removing the pipe
hole, cut the burr for safety.
When connecting pipe path through rear
NOTICE
wall, don't remove the hole.
Drain hose junction
1. Remove the rubber stopple of desired
direction of drainage.
2. As the following picture, Insert drain hose in
the handle of drain pan, and join drain hose
and connecting hose.
10 Room Air Conditioner
Pipe hole
Adhesive
Connecting
part
Drain
hose
Panel Front
Connector
Only one
desiring direction
rubber cap

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents