Preparing Work For Installation - LG LA090CP Service Manual

Hide thumbs Also See for LA090CP:
Table of Contents

Advertisement

Preparing Work for Installation

Open front panel
1. Push the front panel backward and lift it up to remove the two screws.
2. As soon as you lift the both lower parts of panel front, you can hear the sound from panel front. At this moment
panel front is separated
3. After pulling down this panel a bit, separate connecting wire from the product.
Remove pipe cover and side cover
1. Remove two screws(for fixing pipe cover)
2. Pull up the side cover of desired connecting direction,
and then side cover is separated.
3. Pick the pipe hole of the side cover.
CAUTION: After removing the pipe
hole, cut the burr for safety.
When making pipe path through rear
NOTICE
wall, you don't need to pick the pipe hole.
Drain hose junction
1. Remove the rubber stopple in the desired drain direc-
tion.
2. Insert drain hose into the handle of drain pan, and
join drain hose and connecting hose according to the
figure by.
Pipe hole
Side cover
Adhesive
Connecting
part
Drain
hose
Installation
Panel Front
Connector
Only the
desired direction
rubber cap
Service Manual 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

La120cp

Table of Contents